Free for small hospitals: the NABH preparation checklist (PDF)

Ward stories · Sprint 117

The equipment switched off at the wall

What went wrong

Sprint 79 proves a machine was fit to be used. This is the commoner and quieter failure: the machine was present, working, plugged in, attached to the patient — and doing nothing at all. Every one of these passes every check a hospital currently runs. The asset audit finds it. The maintenance schedule finds it. A nurse walking past sees a device with a light on beside a patient. The only thing that finds it is somebody standing at the bed, confirming that the thing it exists to do is happening.

What the screen does now

/ipd/devices — IPD → Devices at the bedside, permission Ipd.Clinical: six tiles, the devices on patients now with what each is there to do and when anybody last confirmed it, the alarm-silence log, and the rendered device.

See it in the demo hospital More stories

WhatsApp