Free for small hospitals: the NABH preparation checklist (PDF)

Ward stories · Sprint 59

The surgical safety checklist as a measured record

What went wrong

Sprint 9 already stores all seventeen boxes and refuses an incision until the time-out is stamped. That is worth having and it is not safety. A checklist ticked from memory at the end of the list prevented nothing, and every published audit of these finds the same gap between the paperwork and the pause. Three things were unanswerable, and this sprint answers them.

What the screen does now

/ot/checklist — Operation theatre → Safety checklist, permission Ot.Schedule: six tiles and two tabs — The board (each case on the day with its three phases, the pause timer, the exceptions and the stop) and Compliance (per phase, with the pause and the excused items beside it). One export.

See it in the demo hospital More stories

WhatsApp