Free for small hospitals: the NABH preparation checklist (PDF)

Product › Quality & safety › Water plant & dialysis loop

Water plant & dialysis loop

A chlorine test taken between the two carbon tanks before the first patient, an action level at half the maximum, and a loop that does not go back into service until somebody has tested the rinse

Why it exists

A person drinks two litres of water a day through a gut that stops most of what is in it. A haemodialysis patient meets a hundred and twenty litres in one session — four hundred a week — across a membrane, with nothing in the way at all. The water in a dialysis unit is not a utility but a drug, and the plant that makes it is a piece of clinical equipment. It fails in exactly two ways, and both take out a whole shift at once rather than one patient.

Read the ward story →

In the HMIS: /quality/water

Open it in the demo hospital

Water plant & dialysis loop screen in Medspire HMIS (Quality & safety)
The real screen, captured from the demo hospital. Click to open full size.

Also in Quality & safety

Mortality & morbidity

Every death found from the record, expected separated from avoidable, and a verdict that leaves the room

Complaints & grievances

Kept in their words, investigated by somebody else, answered in their language

Incidents & near misses

Raised from the build's own interlocks, and graded on what actually happened

Major incidents

A declaration with a name and a minute, a capacity stated as a number inside half an hour, casualty numbers that are the identity until somebody knows the name, and a recall counted by who arrived

Mortuary & body release

A cause of death written as a sequence rather than as cardiorespiratory arrest, a body identified against its tag number in front of a witness before anybody signs, a medico-legal death that stays the police's until they release it, and the registrar's twenty-one days

Fire, evacuation & drills

A horizontal refuge that names a place, escape routes walked rather than certified, an evacuation plan written bed by bed with the hands it needs set against the night staff, and drills whose findings have to close before the next one

Violence against staff

A named person rather than *staff*, the twenty minutes before rather than the blow, security measured in minutes, and the decision to talk somebody out of complaining recorded as a decision

Needlesticks & exposures

The sharps injury and the splash, with the clock running from the moment it happened rather than from the moment somebody found the form — the gap before anybody was told, the source patient's consent, the prophylaxis window, and a preventive action that names a thing rather than the injured person's carefulness

WhatsApp